What is an electric charge point?

An electric charge point is a facility where electric vehicles recharge their battery. A distinction is made between controlled and uncontrolled points: uncontrolled ones release power the moment a cable is plugged in, which can cause unplanned peaks on the grid. Controlled points manage access, allow remote maintenance and billing, and can be integrated into energy management.

What is the difference between a CPO and an EMP?

The charge point operator (CPO) runs the charge points — hardware, electricity, location. The e-mobility provider (EMP) issues charging cards and holds the contract with the driver. Roaming connects the two: a driver with an EMP card can charge at a CPO, and the money flows back through the roaming platform.

What is an RFID card and how do I get one?

The RFID card authorises the session at the charge point. In the backend it is linked to a user, a vehicle and a tariff. Business customers obtain cards through their tenant account; end customers order them through the ENIO portal. In B2B use the card cost is included in the app fee.

How do I pay for a charging session?

There are five routes: an internal RFID card with no charge, an ENIO or white-label charging card, a third-party roaming card, QR direct payment in the app, and debit or credit card at the ENIO Payment Station. Which applies depends on who you are and where you charge.

Operation & regulation

For operators

What does the AFIR regulation require?

For public charge points installed after 13 April 2024, AFIR requires card payment via a payment terminal, a uniquely generated QR code or an integrated card reader. Operators must also provide consumers with electronic information on availability, waiting time and price.

What does calibration-law compliant mean?

The energy delivered must be measured and documented so the customer can verify it. This covers the meter, the receipt and the storage of records. The ENIO Payment Station is certified, the receipt is produced in the backend and stays traceable there.

What separates internal, semi-public and public charging?

Internal means an employee charging a company car with no charge, posted to a cost centre. Semi-public covers people close to the business — employees with private cars, long-term tenants, affiliated companies — at bilaterally agreed prices. Public means any external driver, at the price set by the operator or dictated by roaming.

Can I claim the GHG quota for private charge points?

ENIO settles the quota only for public and semi-public charge points — for private ones the effort outweighs the return. In Austria registration on ladestellen.at with a valid EVSE ID is required, in Germany with the BNetzA; semi-public points do not qualify there.

When can I reach ENIO?

Support is available on working days from 8am to 5pm on +43 1 934 6681-0 and at info@enio.at. Operators with a service agreement have the response times agreed there.

Prices and roaming

Who sets the price — and where you hold it yourself

The most common disappointment in the charging business: an operator sets a price and is surprised that the driver pays something entirely different. That is not the backend — it is how the market roles are divided.

Who decides what the driver pays at my charge point?

It depends on how they pay. There are exactly two worlds. If they charge ad hoc — with a debit or credit card at the payment station, or by QR code in the app — you set the price, because in that moment you sell directly to the driver. If they use a roaming card, the price is set by the mobility provider (EMP) whose card they hold. In that business you are not the seller to the driver but the supplier to the EMP.

Why can I not influence the price of a third-party charging card?

Because the customer relationship belongs to the EMP, not to you. The driver has a contract with their card provider, not with you. Between you and the EMP there is a B2B price per kWh — the amount the EMP pays you for the session, and that is the only figure you negotiate. What the EMP makes of it for its own customer is their calculation: a base fee, their own mark-up, possibly a blocking fee and their roaming costs on top. The roaming protocol OCPI carries tariffs and charge detail records between the systems, but it does not tell any EMP what to charge its customer.

So what do I actually receive for a roaming session?

The bilaterally agreed amount per kWh, less the discount fee. With ENIO that amount sits in the backend for every single transaction — together with the price the EMP actually paid and the discount fee. That is what we mean by transparent billing: you see not only what reaches you but also what happened before. For larger customers we deliberately do not offer guaranteed fixed prices, because then the spread stays with whoever settles instead of with you.

Why is ad hoc the only price I really control?

Because nobody stands in between. Charging ad hoc, your company sells directly to the driver — there is no EMP holding the customer relationship and no roaming contract dictating the price. You set the price in the backend, the change takes effect at the charge point immediately, and you see the revenue directly. That is why a payment station pays off even with the bank transaction fee: the pricing power you gain is usually worth more than the discount fee you would save.

Am I completely free to set the ad-hoc price?

Free, yes; arbitrary, no. AFIR requires ad-hoc prices to be reasonable, transparent and non-discriminatory — you may not put ad-hoc users at a disadvantage against contract customers without an objective reason. For public charge points of 50 kW and above put into service from 13 April 2024, the ad-hoc price must in principle be stated per kWh; an additional time-based blocking fee is permitted. From 1 January 2027 this applies to every public charge point of 50 kW or more, whenever it was built. Below 50 kW other price components are allowed, but they must be clearly visible before charging starts.

Where else does my ad-hoc price end up?

In Austria, in the national charge point register. The Ladepunkt-Daten-Verordnung (Federal Law Gazette II No. 257/2024) obliges operators of publicly accessible charge points to report static and dynamic data to the regulator E-Control — including the ad-hoc price broken down by price components, and current availability. On ladestellen.at every driver sees this before setting off. Points offered free of charge are exempt from the price reporting. ENIO supplies this data from the backend; you maintain nothing by hand.

Why is the ad-hoc price almost everywhere higher than the roaming price?

Because the two prices rest on different calculations. The roaming price is a wholesale price: the EMP brings volume, holds a contract and therefore pays less per kWh. The ad-hoc price is a retail price for the occasional driver — no contract, no volume, card payment fees included. Both make commercial sense: roaming fills the charge points broadly, ad hoc brings the higher margin per session.

Can I set different prices for different user groups?

Yes, and that is the normal case. Employees charge internally at €0.00 posted to a cost centre, guests at their own rate, tenants at a third, external drivers ad hoc at the public price. In the backend the price depends on charge point, user group and time window. The AFIR non-discrimination rules apply only towards ad-hoc customers — within your own user groups you are free.

What is an offer to all, and why does ENIO prefer to negotiate bilaterally?

With an offer to all you publish one price through a roaming platform that any EMP can accept. Convenient — and it means the same price for the discount provider as for the premium fleet card. Whoever sells expensively to their own customers keeps the difference. With bilaterally negotiated contracts that spread reaches you — and a low-price provider still gets terms that work for them, instead of driving past your charge points.

What if an EMP pays less than my electricity costs?

Then the question of fixed versus flexible reimbursement comes up. With the flexible option the price ENIO has agreed with each provider applies — yield varies, but the whole roaming network stays reachable. With fixed reimbursement you receive a guaranteed amount, but every card provider whose agreed price is below it drops out. We recommend the flexible option and go through the figures with you: a smaller amount usually beats a charge point standing empty.

Technology and operation

What runs in the background

What is OCPP and why does the version matter?

OCPP is the language between charge point and backend — authorisation, meter values, error messages, remote control. ENIO speaks OCPP 1.6 and 2.0 so that hardware from different manufacturers works together on the same site. The version decides how finely power can be steered and what diagnostics arrive: 2.0 brings more detail on faults and security functions, while 1.6 runs on the vast majority of installed devices.

What is OCPI?

OCPI is the protocol between backends — between your CPO system and the systems of the mobility providers. It carries location data, availability, tariffs and finally the charge detail records, the CDRs. Without OCPI there would be no roaming: the third-party card would not know your charge point exists, and nobody could settle the session.

What is the difference between auto-charge and plug and charge?

Both start a session without a card, but by different routes. Auto-charge recognises the vehicle by an identifier transmitted when the cable is plugged in and matches it against a list in the backend — this works with practically any hardware. Plug and charge under ISO 15118 uses certificates in the vehicle and is cryptographically secure, but requires suitable hardware on both sides. For depots with a fixed fleet, auto-charge is usually entirely sufficient.

What is a site controller and when do I need one?

The site controller sits in the distribution cabinet and coordinates the charge points locally: it measures power continuously, distributes the available capacity according to the configured load profile and talks to the backend. You need one as soon as several charge points share a connection and the sum of their rated power exceeds what the connection provides — which is nearly always the case beyond two or three points.

What happens if the internet connection fails?

Load management keeps running. The control logic sits in the site controller on site and does not need the backend to respect the grid connection — sessions continue and stay within the limits. What pauses are remote authorisations through the backend and the transmission of session data; both catch up once the connection returns. No sessions are lost in the meantime; the charge point buffers them.

Can I keep wallboxes that are already installed?

In most cases yes. What matters is whether the device speaks OCPP 1.6 or 2.0 and whether the server address can be configured freely — both apply to the common brands. The device is then pointed at the ENIO backend and appears the next day in the same list as everything else. What cannot be taken over are closed systems that only ever connect to their own manufacturer backend.

How do I move from another backend to ENIO?

In three steps: create the tenant, re-point the charge points, take over the roaming and payment contracts. Re-pointing itself is a configuration change on the station and takes minutes per device. The contractual side takes longer — roaming agreements and the payment provider connection are transferred to ENIO so revenue does not dry up in between. We plan the switch so that no charge point goes offline.

How long does it take until a charge point runs?

The software is the shortest part. Tenant, charge points, cards and tariffs are set up within a day, and the station registers itself with the backend once connected. What dictates the schedule is the grid connection: metering point, connection capacity and electrical installation sit with the grid operator and the electrician, and that takes weeks to months depending on region and power.

What does grid capacity really cost me?

Twice: once and then continuously. The one-off grid provision charge applies per kW ordered, and the capacity price runs on the highest measured quarter hour. That is exactly where load management bites — capping the peak means ordering fewer kW and paying less on both counts, permanently. On the load management page you can run your own site through the tariffs of your grid area.

Who owns the charging data?

You do. The sessions of your site belong to your tenant, and you can export them at any time or fetch them through the REST API — down to the charging curve and the vehicle state of charge where the hardware provides it. If you move to another provider, the history goes with you. Personal data of drivers is handled under the GDPR; user groups and cost centres can be cut so that reporting works without personal reference.